Defense Distribution Center Renovation
Owner: US Army Corps of Engineers
Value: $10M
Location: New Cumberland, PA
Services: CPM Schedule & Cost Estimate
The scope of work is renovation and upgrade of structure, walls, waterproofing, interior finishes, site work, site utilities, and MEP work for a 230,000 square feet hanger building, the scope shall generally consist of, but not limited to the following; providing all labor, materials, tools, equipment, permits, testing, and reports required to repair building scope include: Maintain existing exterior painted concrete masonry walls (CMU) by painting. Maintain existing exposed painted steel structure and roof decking at the underside of dock roofs by painting. Maintain existing man doors and overhead doors by painting. Other work is described in the contract documents. Repair existing gutters by replacement. Repair existing north side single pane uninsulated warehouse windows by replacement with aluminum-framed translucent panel & louver system. Repair antiquated steam unit heaters and piping by replacement with hot water unit heaters and piping. Repair Building Automation System (BAS) controls by replacement with current automation controls technology capable of reporting to the Utility Monitoring and Control System (UMCS). Repair rooftop ventilation units by replacement. Repair sprinkler pipe and heads by replacement. Repair existing steel columns damaged overtime to ensure structural integrity. Repair interior electrical system for the majority of the components by replacement. Repair annex area finishes including carpet, drop ceilings and paint by replacement and repainting, respectively. Repair annex roof by replacement including roof drain relocation. Other work is described in the contract documents. Installation of new mechanical/electrical equipment room to support new hot water heating equipment (funded under Repair items above) including a dual-fuel option with #2 Fuel Oil. Install two (2) rapid up overhead doors and custom frame at the northwest and northeast corner of the building (existing overhead doors to remain).