Demolish Buildings & Construct Parking
Owner: Departments of Veteran Affairs
Value: $5M
Location: Coatesville, PA
Services: CPM Schedule & Cost Estimates
The scope of this project consists of abate hazardous materials from the buildings per all environmental regulations than demolishing Buildings 18, 19, 26, 27, and 28, removing them in their entirety, including the in-ground basements and foundations. The scope also includes demolition and removal of associated site features, including the sidewalks and steps leading up to the buildings, the macadam and gravel drive area behind Buildings 19, 26, 27, and 28 along with their associated garages and macadam pavement and backfill at each location. The scope of this project includes rerouting of active telecom and data cables in coordination with the Central Information Officer (CIO). The scope of this project includes the addition of surface parking on a portion of the site around Buildings 19, 26, 27, and 28, as well as the site around Building 18. It includes full site restoration and landscaping. Construction must allow for the continuance of all hospital operations and services provided and coordinate with adjoining projects. After-business hours work may be necessary as dictated by the COR.